Continuing Saga of the Deck
Home | Page Up | Page Down |
|
Surveying
Stage 2 June 28th
|
Lesson learned, never never never ever nail down a deck with 4" or any other size nails |
Trying to salvage some joists
|
Setting the
new main side joist
|
Redirecting gutter run off to avoid washing out new deck supports
|
With path to
old steps incorporated and squared off corners it looks bigger
|
Block and post to support the frame double beam at front for overhang
|
Combination
new full length joists and shorter overlapped recycled joists
|
Samantha measured cut and laid the boards while I laboured for her, Paul and Tony followed behind and screwed them in place
July 9th
Measuring for the last board
|
July 10th
The Saga Of The Railings
|
Decided to place all glass panels together instead of alternating
|
|
|
|